Lists A  - Construction of a tunnel for laying down of a ductile iron pipelines. Work located besides
the desk area of the Swimming Pool near the view station. Different work type is involved such as excavation for tunnel direction, formwork for reinforcement concrete, site suit for concrete and metal work for work place protection and structure for pre-cast tunnel cover.
|
|
|
|
1) Setting line |
2)  Excavation work for the
tunnel |
3) Machine for excavation of the tunnel |
4) Corner of the tunnel |
|
|
|
|
5) Excavated tunnel |
6) Beam structure for tunnel |
7) Reinforcement bars for the tunnel |
8) Formwork for the concrete work |
|
|
|
|
9) Focus of the reinforcement bars |
10) Corner of the reinforcement bars |
11) Pipe installation for pumping concrete |
12) Elbow of the concrete outlet |
|
|
|
|
13) Vibration work for concrete |
14) Dismantling the wood formwork |
15) Main frame bracket installation for the pipeline |
16) Appearance of the tunnel and pipe |
|
|
|
|
17) Cover of the tunnel |
18) Focus of the cover |
|
|